Norway – Building construction work – Alterations to Bingsfoss secondary school.
🇳🇴Lillestrøm Kommune·Norway
Full Description
Lillestrøm municipality, c/o the municipal area Eiendom, shall expand Bingsfoss secondary school in Sørumsand for an increased student capacity and upgrade the school ́s outdoor area while the school is in operation. Bingsfoss secondary school shall be continued as a 6 parallel school for pupils from 8th to 10th years, and by the start of the school year in August 2025 they shall have a capacity for 30 pupils per classroom. This is equivalent to an increased student capacity from approx. 410 to 540 pupils. The project involves the establishment of two extensions facing north, in the extension of the existing classroom wings, alterations to parts of the existing school, as well as upgrading the school ́s outdoor area, which shall be adapted for physical activity. Amongst other things, the current path system along Glomma shall be connected inside the school ́s outside area. The work is planned to be carried out while the school is in operation, where room functions can be temporarily relocated in the pavilions on the school site. The existing building was established in the 1960s and in 2007 it underwent a comprehensive reconstruction and renovation of a base school. The school currently appears as a well-maintained and modern building, but the class classes are too small for the planned student growth in the area. Each step currently has its own floor wing, with two storeys of classrooms in the eastern wing and one floor with classrooms in the western wing. Each floor wing has 6 classrooms and 5-8 group rooms.
Lillestrøm municipality, c/o the municipal area Eiendom, shall expand Bingsfoss secondary school in Sørumsand for an increased student capacity and upgrade the school ́s outdoor area while the school is in operation. Bingsfoss secondary school shall be continued as a 6 parallel school for pupils from 8th to 10th years and at the start of the school year in August 2025, they shall have a capacity for 30 pupils per classroom. This is equivalent to an increased student capacity from approx. 410 to 540 pupils. The project involves the establishment of two extensions facing north, in the extension of the existing classroom wings, alterations to parts of the existing school, as well as upgrading the school ́s outdoor area, which shall be adapted for physical activity. Amongst other things, the current path system along Glomma shall be connected inside the school ́s outside area. The work is planned to be carried out while the school is in operation, where room functions can be temporarily relocated in the pavilions on the school site. The existing building was established in the 1960s and in 2007 it underwent a comprehensive reconstruction and renovation of a base school. The school currently appears as a well-maintained and modern building, but the class classes are too small for the planned student growth in the area. Each step currently has its own floor wing, with two storeys of classrooms in the eastern wing and one floor with classrooms in the western wing. Each floor wing has 6 classrooms and 5-8 group rooms.